Beijing Subway
Subway Train - 13 Subway construction started in China's capital in 1965. The first stretch, which opened between the city's railway station and Pingguoyuan, included today's western branch of Line 1 and the southern part of Line 2. In 1987, the circular line was finished (16 km) and both lines started operating separately. In the 1990's an eastern extension of Line 1 was built; the so-called Fu Ba Line, to Sihuidong (formerly shown as Ba Wang Fan) opened for trial in Oct. 1999 for the People's Republic's 50th anniversary. The new section (13.5 km) was eventually connected to the western section of Line 1 on 24 June 2000, which had been upgraded to ATO operation. ⇦ Back to Page 12 On to Page 14 ⇨Hi-Res Pic (129K) Return to Beijing Subway Scenes - Page 2 |