Noll's Pierland Lane Home

Noll's Pierland Lane Home - in 2011

17. Shop

In 2011 we have removed the old sliding door and replaced it with an automatic overhead door along with a normal door. A over hanging cover complete with gutter has been installed to prevent water going into the shop. Building blocks have been placed to keep gravel and the shop circle from mixing. Many yards of dirt have been placed in the shop circle so landscaping can been done. The shop has been painted. The area to the left has been excavated so the dirt is no longer piled up on the metal sides. A new gutter with the downspout at the far end has been installed. The outdoor bathroom has had a concrete slab installed. Additionally an overhanging cover has been installed. It also has been painted. The shop now has been insulated and sheet rocked.

⇦ Back to Page 17 Old Photo

2011 Hi-Res Pic (226K)