Construction Hot Tub Cover

Piece by Piece - 15

The sheets of the metal roofing are each 3 feet wide. We are now working on the third sheet on this side. I hand the sheet up to Mike. He holds it in place while I take a photo. I get back and climb the ladder inside to help maneuver the sheet into place. It has to slide under the last sheet installed. When that is done, he holds it in place, I get down off the ladder to check that it is level at the bottom with the preceeding sheets. That done, I get back up and hold it in place while Mike get several screws to hold it. We repeat his until all sheets are installed. Our process involves five ladders of various types, lengths and sizes.