Shop Improvement Project 6 Repair Wall Cave-in Shown in this picture is the repair replacement of the collapsed section of the wall. Most of the soil that fell when the wall collapsed was then put behind the new section of the wall. The mud below has somewhat subsided as warmer weather has dried it out. Hi-Res Pic (237K) |
|
⇦ Back to Scene 5 Return to Shop Project Page 1 On to Scene 7 ⇨ |