Shop Improvement Project 8 Electrical Work When the backhoe dug out the east side of the shop it exposed the 100 amp line coming from the house to the shop and the 100 amp line leaving the shop to go to the RV building. Here we are digging out the path for the conduit to be placed to repair the electrical service. The phone service and an additional electrical line going to the outdoor bathroom also was here. The difficulty was compounded by the soil consists of very thick blue clay that defies easy digging. Bernice spent some time dipping out with small plastic cups the water that collected in the channels for the conduit. Hi-Res Pic (241K) |
|
⇦ Back to Scene 7 Return to Shop Project Page 1 On to Scene 9 ⇨ |