Closeup of New Setup

Shop Water Project

4. Closeup of New Setup

Because the pipes going to the three different locations were at different levels and angles we elected to use flexible hoses to allow us to connect the these pipes. Because the manifold in effect floated up in the air we cut blocks for them to rest on. This was complicated in that there was limited space to get the blocks in place. Much cutting and recutting eventually got the job done. The left valve controls the water to the RV building, the middle to the shop, and the right to the bathroom. The cutoff valve sits below at the top. Just almost out of sight sits the valve that allows you to drain the RV building line for the winter.

Hi-Res Pic (198K)
⇦ Back to Page 3    Back to Water Project    On to Page 5 ⇨