Page 9 -

Construction Hot Tub Cover

Install Top Beam - 9

Here we have secured some posts and on top of them the top beam. Some pieces of 2X4s hold them temporarily in place so we can next place the rafters. We put boards on top of the hot tub cover so a ladder can be used. With the efforts of the two of us working together well coordinated we get the job done. The rafters sit on the left side ready to be placed.

⇦ Back to Page 8    On to Page 10 ⇨

Hi Res Pic (234K)

Return to Hot Tub Cover - Page 2