Page 10 -

Construction Hot Tub Cover

Rafters and Rails Installed - 10

With Mike up on top I hand him the boards up one at a time. I then hold them in place as he fastens them securely with brackets and screws. I finally get a break while Mike puts in the last of the screws to take a photo. Before starting this task we paused to put in some corner bracing pieces to steady up the structure. One such corner brace can be seen at the end of the top beam on the left.

⇦ Back to Page 9    On to Page 11 ⇨

Hi Res Pic (253K)

Return to Hot Tub Cover - Page 2