Hoover Dam 12. Intake Towers Before water from Lake Mead reaches the turbines, it enters the intake towers and enters four gradually narrowing penstocks which funnel the water down towards the powerhouse. The intakes provide a maximum hydraulic head (water pressure) of 590 ft (180 m) as the water reaches a speed of about 85 mph (140 km/h). The entire flow of the Colorado River passes through the turbines. The spillways and outlet works (jet-flow gates) are rarely used.[2] The jet-flow gates, located in concrete structures 180 feet (55 m) above the river and at river level, may be used to divert water around the dam in emergency or flood conditions, but have never done so, and in practice are only used to drain water from the penstocks for maintenance.[ On to Page 13   Back to Page 11Hi-Res Pic (125K) Back to Hoover Dam - Page 2 |